waterlogging added to people’s troubles
underpass tunnel filled with water
The speed of the trains slowed down as well as the difficulties for the two wheeler increased because it is difficult to guess whether there are potholes on the submerged road. The tunnel of the underpass under construction was filled with water till the top. According to the Meteorological Department today, along with Delhi NCR, moderate to heavy rain is expected in Haryana, Punjab, Uttarakhand. Although there is no heavy rain alert in the coming week, moderate recorded rain may once again occur.
Many residential societies of Ghaziabad were completely submerged in water. The road names and marks were completely missing and about half a feet of water remained stagnant on all sides till noon. If it had rained for some more time, there was a possibility of the water reaching the knee. Vehicles and two wheelers had to struggle to move on the road. The drainage was completely blocked, if the drains were cleaned on time, so much water would not have filled here.
Read also.
.
Read More In India
Source link